Archived Circular

Sr.No Title File No Issue date Documents
521 Gap between WC pan outlet and crap EM1(10)83/4320 21-Mar-1990

pdfSize :122.94 KB

522 Reg Horticulture work SOI test checked by AE to see the gap between WC pan outlet & trap is filled up properly EM1(10)83/4321 21-Mar-1990

pdfSize :275.9 KB

523 Reg inspections reg issue/maintenance of MBs EM1(10)83/2415 13-Feb-1990

pdfSize :237.37 KB

524 Inspection reg use of benetenite slurry as I.S 2911(Pt.III) 1980 and reg tube strength of 28 days as per Agmt item & special condition EM1(10)83612 11-Jan-1990

pdfSize :1.04 MB

525 Inspection reg use of benetenite slurry as I.S 2911(Pt.III) 1980 and reg tube strength of 28 days as per Agmt item & special condition EM1(10)83612 11-Jan-1990

pdfSize :755.53 KB

526 Reg sending copy of award letter for civil and elect work to CE(QC) and also the progress report for work EM1(10)83/21757 18-Dec-1989

pdfSize :410.6 KB

527 Inspect reg not sending copy of CE(QC)/CTE inspection report to the contractor EM1(10)83/1011 12-Dec-1989

pdfSize :489.67 KB

528 Testing of materials at quality control laboratory at Siri Fort EM1(10)83/20544 28-Nov-1989

pdfSize :217.56 KB

529 Reg procuring sludge and mode of mean EM1(10)83/20543 28-Nov-1989

pdfSize :172.63 KB

530 Reg non-use of acrylic water proofing compound and ordinary water proofing compound to be used EM1(10)83/14805 08-Aug-1989

pdfSize :254.39 KB