Archived Circular

Sr.No Title File No Issue date Documents
411 Proper design of crust thickness of Road as per IRC-37. EM1(10)2005/ 18-Apr-2006

pdfSize :290.41 KB

412 Earth Filling in low lying areas. EM1(10)2005/Cir(Play Field)/DDA Modified vide even No 2347 dt 6-7-06 18-Apr-2006

pdfSize :391.53 KB

413 Execution of Street light Ref: F27(Misc)GC-632/05/Vig/EE(Vig)I/ EM1(10)2005/ 28-Feb-2006

pdfSize :309.02 KB

414 Non stipulation of CI Pipe(Class-LA) to be incorporated in the contracts for the works in DDA. Ref: EM2(3)96/Vol-IX EM1(10)2004/ 19-May-2005

pdfSize :332.16 KB

415 Reduction Item Statement EM1(10)2004/DDA 27-Dec-2004

pdfSize :201.83 KB

416 Preventive measures to check seepage/leakage in Building. Ref: EM1(10)2004/DDA/Pt. EM1(10)2004/ 9449 dt 21-9-2004 21-Sep-2004

pdfSize :163.19 KB

417 Non Stipulation of Cement and Steel and additional condition to be in corporated in contracts for the works in DDA. Ref: WAB1 (76)/ Vol-34. F6(137)FO/Dir(MM) EM1(10)2004/ 9289 dt 9-9-2004 09-Sep-2004

pdfSize :999.64 KB

418 To prevent recurrence of (Out break of ) Gastroentitis resulting in deaths. Ref: EM14(3)99/Vig/DWK/DDA/Pt EM1(10)2004/ 9191 dt 1-9-2004 01-Sep-2004

pdfSize :128.39 KB

419 Monitoring of projects by preparing Bar/PERT Chart for major projects. EM1(10)2003/ 6636 dt 21-7-2003 21-Jul-2003

pdfSize :387 KB

420 Observance of instructions in respect of issue of measurement books. Ref EM14 (1)2003/Vig/MB/DDA. EM1(10)2003/ 3100 dt 10-4-2003 10-Apr-2003

pdfSize :157.25 KB