Archived Circular

Sr.No Title File No Issue date Documents
251 Operation of Clause 10-CC of PWD 788-Clarification EM1(10)83/20457 Dt. 13.12.1990 13-Dec-1990

pdfSize :249.5 KB

252 Delhi schedule of Rates 1980 and technical sanction EM1(10)83/16239 Dt. 17.09.1990 09-Dec-1990

pdfSize :265.47 KB

253 Important aspects (Plinth level, specification & regd. Works) EM1(10)83/18291 Dt. 31.10.1990 31-Oct-1990
254 Reg. Measurements recorded in the measurement books EM1(10)83/16651 Dt. 25.09.1990 25-Sep-1990

pdfSize :190.9 KB

255 Reg the recovery of the amount due to reduction in rates on account of defective/sub-standard/poor quality of the work EM1(10)83/16043 13-Sep-1990

pdfSize :173.19 KB

256 Reg adoption of delhi schedule of rates CPWD 1989 in DDA EM1(10)83/12178 23-Jul-1990

pdfSize :296.5 KB

257 Reg penal rate recovery of stipulated material EM1(10)83/4402 22-Mar-1990

pdfSize :125.24 KB

258 Reg use of ISI marked items EM1(10)83/2272 09-Feb-1990

pdfSize :290.51 KB

259 Reg important instructions reg file foundation work EM1(10)83/1840 15-Jan-1990

pdfSize :441.62 KB

260 Reg technical sanction EM1(10)83/1012 10-Jan-1990