Archived Circular

Sr.No Title File No Issue date Documents
221 Non-provision of CP Brass Traps and union where the waste pipes of the Wash Basins are directly discharging into floor traps etc. EM1(10)95/9608 Dt. 10.5.95 10-May-1995

pdfSize :542.46 KB

222 Monitoring of the preparation and settlement of the final bill of the contractors. EM1(10)95/7083-253 Dt. 4.4.95 04-Apr-1995

pdfSize :1.36 MB

223 Use of proper M.S. Cover and frames for overhead RCC Tanks in order to make it mosquito proof. EM1(10)94/Vol.I3925 Dt. 28.2.95 28-Feb-1995

pdfSize :399.03 KB

224 Secured Advance in r/o unfinished metal products. EM1(10)94/Vol.I/3615 Dt. 22.2.95 22-Feb-1995

pdfSize :257.44 KB

225 Use of Design mix concrete in DDA works. EM1(10)94/Vol.IK.1860 Dt. 30.1.95 30-Jan-1995

pdfSize :193.12 KB

226 Construction of huts by the labour of Construction Agency at the Construction Building. EM1(10)94/15214 Dt. 25.11.94 25-Nov-1994

pdfSize :570.7 KB

227 Critical examination of the role of supervising staff before sanction of RIS. EM1(10)94/14274 Dt. 8.11.94 08-Nov-1994

pdfSize :215.89 KB

228 C.V.C Advice for maintaining JE records/material at site register. EM1(10)83/Vol. IX10373 04-Aug-1994

pdfSize :688.86 KB

229 Supply of potable water in labour camps. EM1(10)83/Vol.IX /6388 19-Apr-1994

pdfSize :239.15 KB

230 Recording of reasons for the deviations made from the provisions of I.S. Code while designing the projects. EM1(10)83/16828 Dt. 6.12.93 06-Dec-1993

pdfSize :232.32 KB