| 221 |
Non-provision of CP Brass Traps and union where the waste pipes of the Wash Basins are directly discharging into floor traps etc. |
EM1(10)95/9608 Dt. 10.5.95 |
10-May-1995 |
Size :542.46 KB
|
| 222 |
Monitoring of the preparation and settlement of the final bill of the contractors. |
EM1(10)95/7083-253 Dt. 4.4.95 |
04-Apr-1995 |
Size :1.36 MB
|
| 223 |
Use of proper M.S. Cover and frames for overhead RCC Tanks in order to make it mosquito proof. |
EM1(10)94/Vol.I3925 Dt. 28.2.95 |
28-Feb-1995 |
Size :399.03 KB
|
| 224 |
Secured Advance in r/o unfinished metal products. |
EM1(10)94/Vol.I/3615 Dt. 22.2.95 |
22-Feb-1995 |
Size :257.44 KB
|
| 225 |
Use of Design mix concrete in DDA works. |
EM1(10)94/Vol.IK.1860 Dt. 30.1.95 |
30-Jan-1995 |
Size :193.12 KB
|
| 226 |
Construction of huts by the labour of Construction Agency at the Construction Building. |
EM1(10)94/15214 Dt. 25.11.94 |
25-Nov-1994 |
Size :570.7 KB
|
| 227 |
Critical examination of the role of supervising staff before sanction of RIS. |
EM1(10)94/14274 Dt. 8.11.94 |
08-Nov-1994 |
Size :215.89 KB
|
| 228 |
C.V.C Advice for maintaining JE records/material at site register. |
EM1(10)83/Vol. IX10373 |
04-Aug-1994 |
Size :688.86 KB
|
| 229 |
Supply of potable water in labour camps. |
EM1(10)83/Vol.IX /6388 |
19-Apr-1994 |
Size :239.15 KB
|
| 230 |
Recording of reasons for the deviations made from the provisions of I.S. Code while designing the projects. |
EM1(10)83/16828 Dt. 6.12.93 |
06-Dec-1993 |
Size :232.32 KB
|